Aircraft parts and assembly production, Aircraft automation facility, Railway vehicle turnout, Marine large facility
Maritime large cavitation tunnel
•A test facility to analyze cavitation in ship propellers (second largest in the world)
•A massive research facility capable of verifying cavitation performance and testing by installing a model ship and a model propeller on the observation area
•Used for developing high-efficiency, low-vibration, low-noise, and low-erosion ship technology
•Contributes to the development of high value-added ships and fleets in industries such as domestic marine shipbuilding and marine defense
A major pumping facility for current generation to be installed in the ocean engineering basin for deep sea by the Korea Research Institute of Ships and Ocean Engineering (KRISO).
The current generation device consists of a current pumping facility and a current channel. The current pumping facility runs five axial flow–type pumps to control the velocity of the flow and its dispersion within the fixed area.
•Construction in progress by the Korea Research Institute of Ships and Ocean Engineering (KRISO) of the Korea Institute of Ocean Science and Technology (KIOST).
•Installed in the world’s largest deep sea ocean engineering basin
•The current generation pumping facility is capable of reproducing fluid flow, such as currents and/or ocean currents, in deep bodies of water.
•Details
► Current pumping chamber: Length: 40 m / height: 18 m / width: 10 m