product Image
SMP Characteristics
Model Name
-
Series
ENGINEERING
Data
-
Manufacturer information
provider logo
HAESEUNG HITECH

Fabrication expert in offshore pipe spool, pressure vessel, heat exchanger, steel structure and incinerator

Problem with product info?
Update request
Manufacturer
HAESEUNG HITECH
Brand
-
SKU
117854
Product Name
SMP Characteristics
Model Name
-
Size
-
Weight
-
Product Details

SMP is placed at mooring site to fit AFT side of the SMP just above the AFT side anchors’ position.

At step 1, The AFT mooring lines are connected to the SMP AFT at the sea surface and the

SMP is lowered to position 2. At step 2, the SMP is placed at position 3

to have the room length of FWD mooring lines and connection at FWD side. At step 3,

the SMP is floated to reach the destined position 4. Finally, the SMP is awaiting

the FPSO to be moored above.



HAESEUNG HITECH
Fabrication expert in offshore pipe spool, pressure vessel, heat exchanger, steel structure and incinerator
Haeseung Hitech.Co.,Ltd. has been manufacturing equipment for offshore & onshore plant. We have specialized in offshore Pipe Spool. With high quality, we completed pipe spools for drill ship, FPSO/FPU, Semi RIG & TLP and we are still progressing. Also, we have various and extensive experiences in pressure vessel, steel structure for onshore plant including HRSG. For becoming a leading global company, we will keep quality management with below [Green business field  realization] , [Keeping the Zero defect ] and [100% On-Time delivery].  
Inquiry