Manufacturer of Automobile facility, Super precision welding facility, Measuring inspection facility, Electron gun production facility
Outline |
Layup: This equipment, after Tabbing, cuts the ribbon into specified length then layers the “+,-“ on top of the Jig Pallet. |
|
Specification |
Capacity |
Wafer 6” 6P*10Cell , 360 String/1Hr Tact Time = 60Sec |
LayUP |
Traverse [Stringing Cell Moving from Taber] |
|
Transfer-1 [Loading to Alignment / Buffer Stage] |
||
Transfer-2 [Loading to Edge Ribbon Cut Stage] |
||
Buffer 4 Station |
||
Stringing Alignment |
||
Edge Ribbon Adjust Cutter |
||
String to String Pitch : 2±0.5mm, 3±0.5mm |
||
Bussing |
Transfer-1 [Load to Jig Pallet] |
|
Transfer-2 [Load to Glass EVA Sheet] |
||
Bushing Jig Pallet |
||
Pallet Return Equipment |
||
Straight Ribbon Bushing Equipment |
||
Angle Ribbon Bushing Equipment |
||
Bus Bar Straight: (after cutting)_R/L ±0.2mm |
||
Bus Bar 90˚ Disposition ±0.5˚ |
||
Soldering Cross area Over 80% (Peel test ] |