PLC Base Low-Voltage Line Monitoring Equipment
Model Name
-
Series
Monitoring / Control
Data
-
Manufacturer information
provider logo
Songam Syscom

Power electronics and communications company, Measuring monitor, Control and Communication products

Problem with product info?
Update request
Manufacturer
Songam Syscom
Brand
-
SKU
36564
Product Name
PLC Base Low-Voltage Line Monitoring Equipment
Model Name
-
Size
-
Weight
-
Product Details

General

This equipment is designed for efficient management of low voltage electric lines scattered in wide range areas. It is installed directly below current transformers or at the end of low voltage electric lines to detect electricity failure, line disconnection, and/or a cut in the line. This equipment detects these problems and automatically reports the information in real time to facility management personnel for rapid counteraction to prevent property damage and injury caused by electricity failure, electric line deterioration, lightning, and/or vandalism. 

 

Songam Syscom PLC Base Low-Voltage Line Monitoring Equipment


Specification

• Power supply : AC220V and/or AC380V

• Communication module : CDMA/PLC

• Reporting method : Voice reporting using SMS

• Exterior interface : Siren and flashing light during alarm signal

• Interface : RS-232 x 1 port

• Battery : 12V 1.2AH (Operational for 2hrs minimum after electricity failure)

Main Function

• Monitoring electricity failure and line disconnection

• Self-diagnosis function : monitors CDMA signal reception level, whether the equipment door is open, status of battery, and other abnormalities

• Sounding of an alarm and/or siren : At detection of a problem or an abnormality to the equipment

 

Application

• Low-voltage electric line disconnection detection

• Theft prevention of low voltage electric lines at building development sites

• Theft prevention of low voltage electric lines used for temporary power

• Theft prevention of underground high voltage cables

• Theft prevention of high-voltage processing neutral wires

• Agriculture/fish farms or any establishments that may experience significant damage from an electricity failure

• Facilities where electricity status(AMR) / security system (crime/disaster prevention) and remote

Songam Syscom
Power electronics and communications company, Measuring monitor, Control and Communication products
Since its establishment in Feb.1991 as a power electronics and communications company, Songam Syscom has been concentrating in ultra high speed information communications and multimedia infrastructure in order to meet the demands in this rapidly changing period of high technology and information based on our broad experiences and accumulated ‘know-how’ to provide the best possible services. Now, our company has developed to receive great recognition from the industry as a leading information communications company in spite of the short history. With the arrival of globalization and information era, our company is committed to rise as a company that specializes in the information communications field that requires the highest level of technology to be prepared for the changes in informational demands and we will contribute to our society as well as our country by continually researching and developing new technologies based on the capabilities and experiences of our management staff. In addition, we promise that our company will strengthen the corporate competitiveness of our values customers to the best of our abilities and emerge as the top-notch information communications company.
Inquiry