에어 블라스터, 에어 캐논, 산업용 진공 클리닝, 컨베이어 벨트 최적화 시스템, 사일로 및 호퍼 청소 서비스 등
AIRCHOC® AIR BLASTER
YOUR ANSWER FOR BLOCKAGES & BUILD-UPS REMOVAL
> BLOCKAGES & BUILD-UPS ARE REMOVED
THE LARGEST RANGE OF AIR BLASTERS ON THE MARKET
> Our whole range of air blasters has been developed for wireless use
> All AIRCHOC® hardwired installations can be converted into wireless
IMPACT : Aerodynamics of the head / Balance between volume & exit diameter
SAFETY : No AIRCHOC® blast with air pressure drop
SAVINGS : Reduced air consumption /only 1 single pneumatic line / wireless system
QUALITY : Fully galvanized tank /cast iron head/ over 30 years lifetime
MAINTENANCE :Direct easy access to the mechanism
RELIABILITY : Protected quick exhaust valve /self-aligning piston
SILENCE : Low noise emissions
DEFLECTORS : Direct the air flows towards sensitive clogging zones – Steel or refractory stainless steel version
AUTOMATIC & CYCLICAL CONTROL DEVICES : Automatically triggered AIRCHOC® blasts (controls up to 128 AIRCHOC®)
INSULATION DEVICE : Secured maintenance operations: high temperature, aggressive products, back flow risk
SAFETY DEVICE : Safe use AIRCHOC®(pressure gauge, pressure relief valve, shut-off valve etc.)
MAINTENANCE KIT : Reduced intervention time & easy inventory
STAINLESS STEEL CHAMFER PISTON : Increased lifetime and aggressive atmospheres proof (chemicals, incineration, cement works)
REMOTE CONTROL RAMP : Triggers AIRCHOC® blasts remotely (centralised solenoid valves positioned at man’s height
PNEUMATIC DISTRIBUTOR : Activates AIRCHOC® blasts pneumatically by positive surge.
CUSTOMER : Italian factory for processing steel waste
PROBLEM : Bridging and rat holing clogging on a double-extraction steel hopper
PRODUCT : Steel waste dust
OBJECTIVE : Eliminate all risks of extraction blockages
SOLUTION : Installation of 4 AIRCHOC® Wireless ACW510SD air blasters.
RESULT : No more shutdowns of production due to clogging of extractions. Safe, user friendly solution with the Wireless: the operator can activate manual blasts with the remote control or from the control room
CUSTOMER : Leader in the cement industry
PROBLEM : Build ups in the preheating tower at the: kiln inlet, smoke box, riser duct and bypass which require 8 hours’ cleaning per day (high pressure and Cardox)
PRODUCT : Raw meal (future clinker then cement)
OBJECTIVE : Eliminate concretion that affect the industrial process and reduces the production capacity
SOLUTION : Installation of 85 AIRCHOC® DN150 air cannons with remote solenoid valves and 2 MACSYS.
RESULT : 100% satisfaction:
– No more build up
– Increased use of alternative fuels
– Rapid return on investment