Search

SEJONG ENGINEERING

SEJONG ENGINEERING

SEJONG ENGINEERING

SEJONG ENGINEERING

HomeManufacturersSEJONG ENGINEERING
1/3
SEJONG ENGINEERING

SEJONG ENGINEERING

GSV Tube Sub Ass'y Line

Model

Series

Assembly Machine


Transaction Process

Please contact the manufacturer/supplier.

Payment

Contact the manufacturer/supplier.

Delivery

Contact the manufacturer/supplier.

Shipment

Contact the manufacturer/supplier.

Origin

Contact the manufacturer/supplier.


Description

This equipment has the car's power steering parts rack housing (GSV-GM) is a facility for sub assembly.

The main process equipment rack housing tube check valve fitting and pressure wash the mouth and consists of the equipment after Assembly.

Housing and the tube is put into conveyor is loaded from the pallet supply articulated robots in two loading and unloading operations are assembled using equipment takes place.

After all this build up of washing process takes place automatically, unattended by a robot Automation line equipment.

Inquiry

Komachine Inc.
Head Office:
Ace Dongbaek Tower 1-1101, 16-4,
Dongbaekjungang-ro 16beon-gil, Giheung-gu,
Yongin City, Gyeonggido, South Korea 17015
Branch Office:
606, Seoul Stratup Center, 10,
Noryangjin-ro, Dongjak-gu, Seoul, South Korea 06938
CEOCharlie Park
Corporate #535-86-00664

ⓒ2024 Komachine Inc. All rights reserved.