TOP
Blockage & Build Up Removal, Industrial Vacuum Cleaning, Conveyor Belt Optimisation and more
POWERNET
YOUR ANSWER FOR BRIDGING PROBLEMS
TOTAL SAFETY : No human presence inside the silos and hoppers/Our teams comply with safety standards
SAVINGS : Production continues while intervention/100% storage capacity regained/material loss
PERFORMANCE : Intervention above or under & on all types of materials/rapid & efficient intervention
ENVIRONMENT : Dry holing (no additives / Pollution free)
DRILLS:
3 types of drills:
– Diameter 65 mm: pre-piercing
– Diameter 150 mm: Piercing
– Diameter 300 mm: Final piercing
CUSTOMER: One of the leaders in the chemical industry in Germany
PROBLEM: Bridging in a silo with a capacity of 9000 m3 (20 m high, 6m diameter). Approximately 15% of the material stored was clogged.
PRODUCT: Sodium carbonate
OBJECTIVE: To empty the silo in order to recover 100% of the storage capacity.
SOLUTION: – First step: Use of pneumatic POWERNET to create a chimney with a diameter of 350 mm.
– Second step: Intervention by pneumatic GIRONET and efficiently clean the whole of the silo
RESULT: The customer recovered all of its storage capacity. Production was not stopped and the intervention took place in complete safety and without human intervention inside the storage unit.
CUSTOMER: Sugar house in France
PROBLEM: Clogging by material of the 70 extractions of the silo. Loss of storage capacity: 1000 tonnes of material clogged in a 5000-tonne silo.
PRODUCT: Sugar
OBJECTIVE: Complete emptying of the silo
SOLUTION: – First step: Use of pneumatic POWERNET to evacuate the extractions
– Second step: Intervention by 2 pneumatic GIRONETs to evacuate the material
RESULT: Recovery of all of the storage capacity of the silonit.