Search

BYUCKSAN

BYUCKSAN

BYUCKSAN

BYUCKSAN

HomeManufacturersBYUCKSAN
1/2
BYUCKSAN

BYUCKSAN

Astex

Model

Series

Ceiling


Transaction Process

Please contact the manufacturer/supplier.

Payment

Contact the manufacturer/supplier.

Delivery

Contact the manufacturer/supplier.

Shipment

Contact the manufacturer/supplier.

Origin

Contact the manufacturer/supplier.


Description

Bio Astex which Helps Activation of Body Functionality with Far Infrared Ray Emission!

 

Introduction

Byucksan Bio Astex, the noninflammable ceiling system, is made by mixing nonorganic raw materials i.e. gypsum, cement, etc. and far infrared ray emitted ceramic raw materials, and is helping to activate body functionality with bio far infrared ray emission. Also, it is the best seller of the ceiling system which is most commonly used to offices or commercials of general buildings due to its processability and economic feasibility. Create more beautiful ceiling with Byucksan Bio Astex.

 

 

Certificates

 

 

Application

Ceiling of general building/high-rise building, office, factory, arcade, apartment, hospital, school, hotel, etc.

Ceiling of place where fire and humidity is prohibited i.e. Underground parking lot, subway station, underpass, paper factory, textile factory, electronics factory, etc.

 

 

Features

 

Size

Classification Thickness (mm) Thickness Tolerance (mm) Width x Length (mm) Width, Length Tolerance (mm)
Ceiling tile 6 ± 0.4 300 x 600 0, -3
Perforated tile

 

 

Packing Unit and Delivery Quantity

Packing Unit Delivery Quantity
18 sheets/Box 5Ton : 312 ~390 Box 18Ton : 780 ~ 936 Box

 

Specific Gravity Length Change Rate by Absorption (%) Bending Failure Load (N) Moisture Content (%)
1.5 or less 0.2 or lower 137.3 or higher 15 or lower

M-Bar Method

M-Bar method is the most common and general construction method, and easy to construct with screw nails but strong.

Construction order is installing carrying channel, minor channel, M-Bar after setting lighting fixture line.

 

 

Detailed Drawing of Cross Section for M-Bar

 

 

Precautions for Construction

Make sure to construct M-Bar carefully to not distort like the image above. Please use KS Standard product (50×19×0.5T) to prevent distortion of M-Bar. In case of using non-KS M-Bar, swell might appear with distortion as thickness and width of (45×17×0.3T) Bar is thin and narrow.

Make sure to use joint clips while joining M-Bar as the image above.

Please follow the order of the image above for screwing screw nails to adhere M-Bar and the product.

For screw positions of screw nails, install with 15mm space from the corner edge like the image above. If screw positions of screw nails are too apart from the edge, well might appear as end part of the product droops.

Construction Direction

 

Download

Catalog-BYUCKSAN-Ceiling-Astex

Inquiry

Komachine Inc.
Head Office:
Ace Dongbaek Tower 1-1101, 16-4,
Dongbaekjungang-ro 16beon-gil, Giheung-gu,
Yongin City, Gyeonggido, South Korea 17015
Branch Office:
606, Seoul Stratup Center, 10,
Noryangjin-ro, Dongjak-gu, Seoul, South Korea 06938
CEOCharlie Park
Corporate #535-86-00664

ⓒ2024 Komachine Inc. All rights reserved.