Systone, Glass wool, Isopink, Gypsum board atc.
Insulation system with the quality never can be emulated
Introduction
Byucksan where takes a part in energy saving through supplying Korea’s best quality organic insulation system uses the high-end Hydrovac TM Process, which is the world’s first patented technology, and produce/supply the vacuum extruded and expanded polystyrene insulation system Isopink. Now, Byucksan will put more efforts for providing the best service to customers along with the reputation established from the quality.
Certificates
Application
Insulation of inner/outer wall and rooftop of buildings i.e. apartment, officetel(Multi-purpose building, office + hotel), etc.
Floors of sports centers i.e. ice link, etc.
Cold storage, insulation of freezing and cooling truck Insulation, heating of pigsty, etc.
Features
Product Thickness | 10 | 15 | 20~45 | 50~75 | 80 | 85 | 90 | 95 | 100 | 105 | 110 | 115 | 120 | 125 | 130 | 140 | 145 | 150 | 155~250 | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Special Type | ||||||||||||||||||||
Type 1 | ||||||||||||||||||||
Type 2 | ||||||||||||||||||||
Type 3 | ||||||||||||||||||||
Thickness Tolerance | +2, -1 | ±2 | ±3 | Followed by agreement | ||||||||||||||||
Width | Special Type, Type 1 | 900 | 1000 | |||||||||||||||||
Type 2, Type 3 | 900 | - | ||||||||||||||||||
Length | Special Type, Type 1, Type 2, Type 3 | 1800 ~ 2900 (in 10mm) | ||||||||||||||||||
Length, Width Tolerance | Length Less than1000 +10, -0 / Length 1000 or more +15, -0 / Length 2000 or more : +20,0 | |||||||||||||||||||
Width Less than 1000 +10, -0 / 1000 or more +15, -0 |
※ Ship-Lap maximum production size - 160T
※ Please contact the sales staff for laminated products with thickness of 180 or more.
※ Please contact the sales staff for the thickness exceeding the production standard.
Edge Type
Square | ||
Ship-Lap |
Item | Insulation Plate | Dampproof Plate | |||||
---|---|---|---|---|---|---|---|
Special | Type 1 | Type 2 | Type 3 | Type 1 | Type 2 | ||
Compressive Strength (N/㎠) | 25 or higher | 18 or higher | 14 or higher | 10 or higher | 12 or higher | 7 or higher | |
Bending Failure Load (N) | 45 or higher | 35 or higher | Density (kg/㎥) | ||||
30 or higher | 25 or higher | ||||||
Thermal Conductivity (Average Temp. 23±2℃)(W/m·K) |
Initial thermal conductivity | 0.027 or lower | 0.028 or lower | 0.029 or lower | 0.031 or lower | 0.031 or lower | 0.033 or lower |
Long-term thermal conductivity | 0.029 or lower | 0.030 or lower | 0.031 or lower | 0.033 or lower | |||
(Ref.) Vapor Permeance (per thickness of 25mm (ng/m2•s•Pa) |
146 or lower | - | |||||
Combustibility | Must have combustion time within 120 seconds and the combustion length of 60mm or shorter. |
※ Remarks : KS M 3808 standard (Initial thermal conductivity value is applied by quality management standard, long-term thermal conductivity value is applied by energy saving design standard of building.)
Hollow Wall (Double Hollow Wall) Piling Method
(1) Pile up inner wall. At this time, bury each Isopink around 40 × 80㎝ by bending in U shape with #16 wire for fixation.
(2) Install Isopink by fixing to already buried fixation wire.
(3) Make sure to have no flexure, and gap in between.
(4) Seal the joint between Isopink with dampproof tape.
(5) Fill the gap with Isopink pieces thoroughly, then seal with tape.
(6) Pile up outer wall by fixing with buried wire.
Bond Method (Complex Insulation Plate)
(1) Laminate Isopink and gypsum board 9.5mm with Isopink Bond 1, and produce laminated panel.
(2) Remove stain or dust on the wall to attach panel.
(3) Cut panel to fit to height of wall.
(4) Attach Isopink Bond 2 in 300mm space with diameter of 50mm, thickness of 3~5mm.
(5) Attach panel to make it horizontal. At this time, screw and fix concrete nail to support until Bond is completely hardened.
(6) Finish the joints with gypsum bond.
Exterior Wall Dry Construction Method
(1) While placing wall concrete, bury wire anchor to fix Isopink and finishing panel to outer surface.
(2) Hang Isopink to anchor. At the time, make sure to have no flexure, especially, close adherence of joint between Isopink.
(3) Hang finishing materials i.e. PC panel or marble panel to anchor to fix.
Rooftop Insulation Method
(1) Spread Isopink to stick to slab surface after drying ceiling slab surface.
(2) At this time, make sure not to have gap between Isopink.
(3) Spread humidity resistance tape in gaps.
(4) Spread dampproof layer tightly.
(5) Construct dampproof layer.
(6) Spread topping concrete in a certain thickness.
(7) Process finishing.
* Please inquire for details of cooling storage construction method and ice link floor construction method.